I'm planning to get a 40' shipping container this spring. Before I set one down, I'd like to put it on a raised rock base for a couple reasons. First, to ensure it's got drainage and stays outta the mud. Second, to do some mild leveling if need be. The spot is about perfect already. I just had a few questions if there are any dirt work guys on here.
Pretend this is a normal distance from a quarry or pit where the stone is available. What should it ballpark cost to have the rock hauled and leveled? There is only about 4" of topsoil (not sure if that needs to go or can stay). I just want 6-8" of a raised bed of 1-2" rock under it, and whatever kind of parking lot or road fabric under that to block weeds from coming up through it.
Pretend this is a normal distance from a quarry or pit where the stone is available. What should it ballpark cost to have the rock hauled and leveled? There is only about 4" of topsoil (not sure if that needs to go or can stay). I just want 6-8" of a raised bed of 1-2" rock under it, and whatever kind of parking lot or road fabric under that to block weeds from coming up through it.